Railway Upside Up Sirince Bridge

When the railway rises, there will be no problem in Selçuk: In the severe rainfall, only one point of Selçuk occurred in the point known as Şirince Bridge Railway underpass. In the statement made by Selcuk Municipality Directorate of Science Affairs, it was stated that the reason of the problem was due to the fact that the road level of Şirince Bridge Railroad was lower than the required level. for the normal road level of about 150 cm in the statement stated that it is obligatory to do below, therefore, in the extreme rainfall occurred in the area of ​​water deposits were expressed.
In order to solve this problem, Selcuk Municipality said that Seljuk Municipality Directorate of Science Affairs teams had been working in the lowest area of ​​the road. Stressed by the State Railways (FDI) for the rooted solution of the problem at that point should be upgraded to the railroad, emphasizing that the official applications can not get results from the Directorate of Science Affairs, the problem will be jointly carried out by the Greater Izmir Municipality and State Railways until the end of 2015 year. He stated that he will have a complete solution within the scope of İZBAN Project between İzmir and Selçuk.

Similar Railway News

Similar High Speed ​​Train News

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.