ASELSAN's high engineering talents also bear the signature of Turkey's giant-scale transportation and infrastructure investments. ASELSAN is establishing the Toll Collection System for the 1915 Çanakkale Bridge and Motorway Project, which is one of the private highway projects tendered with the build-operate-transfer model, which will reduce the passage time of the Dardanelles to six minutes. The project includes a total of five stations, a Main Control Center (AKM) and a Disaster Recovery Center (FKM). The temporary acceptance procedures of Kavakköy and Gelibolu Güney stations belonging to the highway were completed and their deliveries were made.
ASELSAN Wage Collection System allows the operator to; It meets all the requirements of highway pass guarantee with the General Directorate of Highways, cash collection with toll booth operators, automatic transit with OGS-HGS banks, cash/credit card payment with finance, VAT reconciliation requirements.
Be the first to comment