3, Bridge's feet have exceeded 200 meters

3, Bridge's feet have surpassed the 200 meter: The works on the 3's Bosphorus Bridge, which is currently under construction in Istanbul, continue at full speed. In the aerial views of the bridge, there are studies on the feet and other areas whose height exceeds the 200 meter. When the bridge's feet are finished, the 320 will reach the meter length. 2 10 strap bridge with 59 strap will be 1408 meter width and 3 meter length will be specified. The 29 Bridge and Northern Marmara Highway Project is planned to be completed in 2015 May XNUMX.

 

Be the first to comment

Leave a response

Your email address will not be published.


*