Station Bridge Works affect the traffic negatively: The traffic chaos in the city center continues increasingly as the power passes. The Station Bridge was destroyed while the efforts to bring the High Speed Train Line underground. The fact that the road is not opened to traffic after long works causes the reaction of the local tradesmen, and the majority of the traffic is directed towards Kızılcıklı Mahmut Pehlivan Street, which affects the drivers negatively. Ambulances who wanted to go to the scene in case of emergency became unable to move due to the traffic jam on the street. Citizens around. 'It will be inevitable to experience loss of life in the city where even the ambulance cannot move. Now find a solution to the traffic "found in the comments.
Related Articles
Joint Operation of Gendarmerie and Police from Yht Line Thieves
Joint Operation by Gendarmerie and Police against YHT Line Thieves: As a result of the operation carried out jointly by Bilecik Provincial Gendarmerie Command and Bilecik Provincial Police Department, High Speed Train [more…]
Preparation of Survey Violet and Pedestrian Overpasses in Istanbul
Preparation of Strengthening Projects by Studying Bridges, Viaducts and Pedestrian Overpasses throughout Istanbul ISTANBUL METROPOLITAN MUNICIPALITY STUDIES AND PROJECTS DEPARTMENT INFRASTRUCTURE PROJECTS DIRECTORATE Istanbul [more…]
26.000 m3 excavation and 5.000 m3 basic concreting work remained at Bağcılar metro station
The last floor, which is the most basic floor of the metro station tunnel drilling works in Bağcılar Square, which has been continuing since the end of last year on the 5.8 km long Otogar-Kirazlı metro line. [more…]
Be the first to comment