Another important knot is untied in urban public transport. The Rail System Signaling Project, which was initiated by the Bursa Metropolitan Municipality to make transportation more comfortable and to save time for the citizens in the rail system, was completed. The first time that the study, which will reduce the signal time in the metro frequency from 4 minutes to 2 minutes, will be put into operation, will be held on Monday, October 25, 2021, at 14.00, by departing from Acemler Bursaspor Metro Station to Şehreküstü Metro Station by Bursaray, at 14.30 at Şehreküstü Metro Station. meeting will be held.
Be the first to comment