AFRAY and YHT are Integrating Drilling and Survey Works Completed

AFRAY and YHT are Integrating Drilling and Survey Works Completed
AFRAY and YHT are Integrating Drilling and Survey Works Completed

The AFRAY project, which is among the election promises of Afyonkarahisar Mayor Mehmet Zeybek, integrates with the High Speed ​​Train (YHT) with the joint efforts made with the Ministry of Transport and Infrastructure.

Regarding the final state of the project, TCDD 7th Regional Director Adem Sivri made a presentation with a 3D animation video he prepared to President Mehmet Zeybek, Vice Presidents Süleyman Karakuş, Murat Öner and Benol Kaplan. AFRAY, which is integrated with YHT, will make it faster for incoming passengers to reach the city center via Ali Çetinkaya Station. 7. Regional Manager Sivri stated that the drilling and survey work related to the project has ended.

Afyon Kocatepe University (AKU) Ahmet Necdet Sezer Campus (ANS) facilitates the transportation of students studying in the city, and also Erenler, KarşıyakaIt will make a significant contribution to the relief of urban transportation by passing through the Yeşilyurt and Ali Çetinkaya neighborhoods. Erenler, especially BATTERY, KarşıyakaCitizens using AFRAY from Yeşilyurt and Ali Çetinkaya neighborhoods will reach the city center by nostalgia tram at Ali Çetinkaya station.

WE WILL CARRY PASSENGERS COMING BY YHT TO THE CENTER WITH AFRAY

Stating that the AFRAY project is planned to be included in the 2021 investment program, our President Zeybek said that the project will be completed as soon as possible and will be put into service of the citizens. Stating that the division of labor was made regarding the construction of AFRAY, Zeybek said, “The stations were to be realized by us as the municipality and the other parts by our state railways. The company, where the project tender was made and the project, made a presentation to us last month. After the presentation, we held a consultation meeting with relevant public institutions and organizations. The line constructed was considered parallel to the Afyon-Gazlıgöl and Eskişehir railway lines. Because the student will have a long walking distance to the university, a new route has been determined. We calculated that it would be much more efficient if a connection was made to the high-speed train line, provided that a line was built in front of the university from the dormitories area and two stops were made. The project related to the route was completed. 7. Our Regional Directorate submitted the project modification to the general directorate and the relevant project firm also realized it. Now, a route has been determined in the style we want and everyone accepts, ”he said.

A VERY BEAUTIFUL PROJECT FOR THE DEVELOPMENT OF OUR CITY

Our President Zeybek, who drew attention to the fact that the route that students studying at the university can easily use has been formed, continued his speech as follows; We will connect our guests who come to the High Speed ​​​​Train station to the center with the suburban line. We aim to transport our guests and visitors who come to the station to the center with the Nostalgic tram. It is a very good project for the development of our city. Good luck to our Afyonkarahisar.

Be the first to comment

Leave a response

Your email address will not be published.


*