OMU Rector Bilgiç Receives Rail System Acknowledgment

omu rektor bilgicten rail system thanks
omu rektor bilgicten rail system thanks

Samsun Metropolitan Municipality Project Transportation İmar İnşaat Yat. Singing. ve Tic. Inc. (SAMULAŞ), the 29 kilometer light rail line between Ondokuz Mayıs University and Tekkeköy has started to operate as of today (5 July Friday).

A further 7 stops have been added to the tram line that started to carry passengers in the OMU Kurupelit Campus section of the light rail system, which has been continuing test drives for a while. Thus, with the 3rd stage of the tram, the total length of the rail system reached 35 kilometers and the number of stops reached 43.

Tram passes in front of each faculty
Nineteen May University rail system line is 6 kilometers long and consists of 7 stops. The stations within the OMU line were named as Housing, Faculty of Medicine, Faculty of Dentistry, Health Sciences, Life Center, Education Faculty and Dormitories.

Thanks to Rector Bilgiç for his contribution
Rector who made a statement on social media about the Rail System line that started to work on campus. Dr. It Our students, employees and the people of Samsun now have the opportunity to reach our campus more comfortably with a single vehicle. We would like to thank Mr. Yusuf Ziya Yılmaz, Mr. Zihni Şahin and Mr. Mustafa Demir, one of our Mayors who contributed to the realization of this important service, and all those who contributed to the design and construction of the project. I wish the rail system to be beneficial to our University and Sams. ”

Be the first to comment

Leave a response

Your email address will not be published.


*