Gölcük Yüzbaşılar Bridge Crossing Opened to Traffic

Contact Golcuk directly
Contact Golcuk directly

Kocaeli Metropolitan Municipality, one of the important projects to make the city's main arteries in the city more fluid. The bridge crossing, which was realized in the Gölbaşı district, is now opened to vehicle traffic. Gölcük Yüzbaşılar Köprülü Intersection has made the transportation network in the region uninterrupted and eliminates the traffic congestion. Golcuk Captives Köprülü Junction, which was provided by Kocaeli Metropolitan Municipality on the D-130 Highway, was also present at the opening of the bridge.

THE LINE WAS DRAWED IN THE CROSS
Gölcük Captives Köprülü Junction, which was implemented by the Metropolitan Municipality for the comfortable and smooth running of the transportation network in Kocaeli, was finally opened to vehicle traffic by drawing road lines. With the intersection project at D-130, the area where traffic density is created by the vehicles which are transported by intercity transportation, will take a sigh of relief.

UNINTERRUPTED TRANSFER
Gölcük-2, Değirmendere Interchange after the Junction Interchange, will contribute to the transit of traffic in the region. The captains' junctions, which are located after the Gölcük-2 intersection and currently controlled by traffic lights, will provide a more comfortable transition with a bridge junction.

20 MILLION GIANT PROJECT
With the project that cost 20 million 457 thousand TL; 96 thousand cubic meter excavation filler, 10 thousand cubic meter concrete, 144 pieces bored pile (3 bin 500 meter length), thousand 850 cubic meter stone wall, 6 bin 800 meter drain line, thousand 900 square meter wall, 30 thousand tons plentmiks foundation, 26 bin 500 tone asphalt, 11 thousand meter long border, 10 thousand square meter pavement and 190 pieces precast beam production was made.

190 METERS LONG
The crossroads on the D-130, along with the main roads and intersections, are 2 bin 800 meters long. 7 and 8 are one and a half meters long, and 20 is the main road. The 8-span bridge with 190 span will serve as 2 strips with 2 strips.

Be the first to comment

Leave a response

Your email address will not be published.


*