Gayrettepe-Istanbul Airport Metro Operation Current Status

gayrettepe istanbul airport metro status
gayrettepe istanbul airport metro status

The foundation was laid in 2016, Istanbul New Airport-Gayrettepe Metro Line 1. In 2019, 2. The stage will be launched in 2021.

The Gayrettepe-New Airport Metro line 1, which was built by the Ministry of Transport and Infrastructure to provide transportation from the city center to Istanbul Airport. The work in the stage continues in full swing. The work at İhsaniye, Işıklar Otogar, Göktürk and Kemarburgaz stations on the subway line was accelerated.

The total length of the line is 70 mileage. Gayrettepe-Istanbul New Airport in the direction of approximately 38 kilometers, Istanbul New Airport-Halkalı In the direction of the 32 is designed as kilometers.

The first stage of the metro line will connect the Istanbul Airport to the city center and the second stage will be opened in 2019.

Gayrettepe-Istanbul Airport Metro Line Besiktas, Sisli, Kagithane, Eyup and Arnavutkoy district of the line will pass the station, Gayrettepe, Kagithane, Kemerburgaz, Gokturk, Ihsaniye, New Airport.

Even if the flight frequency is planned as 3 minutes, the travel time will be 32 minutes and the maximum operating speed will be 120 km / h. When the line is completed; At the Gayrettepe station M2 will be integrated with Yenikapı-Hacıosman metro line and metrobus plant.

Ads

Similar railway news

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.