Trambus test drive started in Sanliurfa

Trambus test drives in Sanliurfa were completed successfully. The trambus, which will serve on the 63 line between the monument and Balıklıgöl, received full marks on the test drive without any problems.

Nihat Çiftçi, the Mayor of Şanlıurfa Metropolitan Municipality, participated in a test trip with the representatives of the local and national press organizations operating in the city. Meeting with members of the press in the center, President Nihat Çiftçi returned to the collection center by using the same direction as the Atatürk Street, Kapaklı Passage, Samsat Square, Demokrasi Street, Balıklıgöl and Archeology Museum. No transportation was carried out on the 7 kilometer.

After the ride, the President's Couple made a statement to the reporters, said the purpose of the Sanliurfa transportation to bring permanent solutions, he said.

PRESIDENT FARMER: SANLIURFA, THE BEST OF THE SERVICE LAYIK

Stating that the transportation of the trambus in Sanliurfa will be more convenient and environmentally friendly in Şanlıurfa,. We carried out the test drive of a transportation project which is very important for our Şanlıurfa. The transportation system of our age in Trambus. It is quiet, environmentally friendly and provides a very high capacity. Together we have completed the 190 kilometer. Comfortable and comfort too high. Sanliurfa'ın historical places will serve on our line 7. All our machines will be driven by both the line and the turnstile. Because the 63 kilometer line of the 7 kilometer is the catenary, the other passes through the catenary. A very economical transportation system as fuel. The fuel is reduced to 3.5 in 3 in 1 in 5 compared to diesel. This is economically very economical. We are very happy to have implemented this project. I congratulate all of our friends. As we always say, our people in Şanlıurfa deserve the best of the service. Her

TRANSPORTATION SUMMIT 21

. 21 will be launching literally in the aftermath of the Transportation Summit in November, as he added. After the summit our trambus application will be fully operational. Then we will launch the tram system. The satisfaction of our people gives us strength in our work. Our work will continue at full speed. AK Municipality has this understanding, AK he said.

Ads

Similar railway news

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.