Türel against Kılıçdaroğlu for the "Light Rail System" Case

Antalya Metropolitan Municipality Mayor Menderes Türel slander the CHP leader Kemal Kılıçdaroğlu will give account in court. President Türel filed a sue for an indictment against Kılıçdaroğlu. If President Türel wins the case, this money will be ordered by the residents of Antalya residents.

CHP Chairman Kemal Kılıçdaroğlu 24 2014 3 XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX. By comparing the light rail system, the rail system in Antalya was more expensive.

”Kılıçdaroğlu slandered“

President Türel, the next day, the press release and participated in the TV program to public by explaining the lies and slander Kılıçdaroğlu'nun lying in the face of a face. Line lengths, number of stops, length of stops, tunnel (NATM), open and closed tunnel structures, highway interchanges, underground stations, transformer numbers, infrastructure transfer, 5 km old rail system line dismantling, pedestrian overpasses said that the comparison of Antalya and Izmir tenders would not be accurate Türel, as always Kılıçdaroğlu'nun mud horse trail in the thought of dirty politics and threw himself slander, he said.

Attack to spiritual personality

President Türel, the CHP leader Kemal Kılıçdaroğlu'nun three days before the elections, no moral understanding of the false false figures to pronounce the right, defamation and defamation of the law to deceive the public; thus, he stated that he had tried to obtain political rent and filed a compensation claim by claiming that he was attacked unjustly against his personality and spiritual personality.

“He chose to resort to dirty roads“

Türel said that Kılıçdaroğlu'nun failed in every election that his party failed, Kılıçdaroğlu'nun failed, although he should look at the misdemeanor; he said that he had chosen to resort to dirty means such as slander, land use and so on. Türel, "squares, televisions on" POLITICAL ETHICAL "CLEAN POLITICS" throwing speeches Kılıçdaroğlu, will lose, unfortunately again lied, slander hugged "he said.

Tender specifications in the case

The total length of the Izmir project is 22.3 km. While Antalya 3. The Stage Light Rail System Project consists of 24.9 all lengths, 38 ground floor 1 units with double lines, 94 meters long platform with stops, 5 km nostalgic tram system is completely disassembled and renewed. In the case of Türel's case, which explains that there is a Light Rail System with much more advanced technical features, the projects and tender specifications of this tender are obtained through a tender in accordance with the Public Procurement Law No. 4734 and the The consultant and consultant were also understood to be understood by a firm.

Türel also stated that the firm that participated in the tender of İzmir also participated in the tender for Antalya, but said that the price was not more than the tender price.

Kılıçdaroğlu'nun all these claims in the petition of the case, President Türel won the case if the fate of his fellow town of Antalya announced that he would feast with the famous.

Be the first to comment

Leave a response

Your email address will not be published.


*