Tender Announcement: Improvement of Level Crossings in Narlı-Malatya Line

Improvement of Level Crossings in Narlı-Malatya Line
GENERAL DIRECTORATE OF THE TURKISH STATE RAILWAYS MANAGEMENT (TCDD) 5. REGIONAL PURCHASING DIRECTORATE

5 Regional Directorate Narlı-Malatya Line Km: 71 + 425-248 + 471 Improvement in Level Crossings (46) The construction work will be tendered under open tender procedure according to the article 4734 of the Public Procurement Law No. 19. Detailed Information about the auction can be found down below.
Tender Registration Number: 2018 / 204886

1 of Administration
a) Address: GAZİ MAHALLESİ MEDENİYYET CAD. NO: 10 / 2 44080 YEŞİLTEPE / YEŞİLYURT / MALATYA
b) Telephone and fax number: 4222124800 - 4222124816
c) E-mail Address: 5bolgemalzeme@tcdd.gov.tr
ç) The internet address of the tender document can be seen at: https://ekap.kik.gov.tr/EKAP/

2-Construction work
a) Qualification, type and quantity: 620,801 ton Bitumen supply (including shipping) - 85348,000 m2 7 cm Stuck to Thickness 1 m² Asphalt Concrete Binder Layer (With Broken and Eliminated Hob Stone)
Detailed information can be obtained from the administrative specification contained in the tender document in EKAP.
b) Location: MALATYA
c) Date of commencement: within 7 days from the date of signature of the contract
work place delivery will start.
d) Duration of work: 150 (one hundred and fifty) calendar days from the delivery of the place.

3- Tender
a) Location: ÖZALPER MAH. STATION CAD. NO: 1 YEŞİLYURT MALATYA
b) Date and time: 01.06.2018 - 09: 30

Tender notices published on our website are for information only and do not replace the original document. The original document is valid for the differences between published documents and original tender documents. Our sources are Official Gazette, Daily Newspapers, Public Institutions and Institutions web pages.

Similar Railway News

Similar High Speed ​​Train News

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

2 Comments

  1. Winner: ALTINIŞIK CONSTRUCTION
    Amount: 5.333.333,33 TL
    Reduction:% -32,5

  2. Winner: ALTINIŞIK CONSTRUCTION
    Amount: 5.333.333,33 TL
    Reduction:% -32,5

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.