Gebze Metro Consultancy Pre-Qualification Tender Done

Kocaeli Metropolitan Municipality by the metro line will be made in Gebze. Prior to the construction of the line, the Metropolitan Municipality conducted a preliminary qualification tender for the construction of the line, indicating the construction and electromechanical works, engineering and consultancy services. 5 company participated in the tender. Su-Yapı + Proyapı, Yüksel Proje, Arcadis Nederland + Tümaş Türk, Altınoluk Consultancy + Apco Teknik, UBM A.Ş gave the files for pre-qualification tender. After reviewing the files of the Commission, the companies which are considered to be eligible will be identified and evaluated during the subsequent tender period.

FULL AUTOMATIC

Gebze metro line, which will use the GoA4 driverless full automatic subway consisting of 4 vehicles, will have a capacity of 1080 passengers. The driverless subway will be available for 12-second intervals thanks to the signaling equipment on the 15,6-station metro line of 90 kilometers. It is planned to complete the 15.6 km metro line between Gebze-Darıca and complete it in 560 days. Transportation between Darica, Gebze and OIZs will be provided in 19 minutes. 14,7 kilometers of the line will be built as 900 meters of tunnel.

DRIVING METRO

4 in the project where the latest technology will be used. At the level of automation (GoA4) full automatic driverless subway will serve. High performance, high reliability and low voyage intervals, low operating costs without driver, better respond to passenger demands increases the attractiveness of metros. For these reasons, the full automatic subway system in which transitions will be started will be implemented in Gebze-Darica line.

19 MINUTE TRAVEL TIME

Maintenance and repair of the Metro vehicles will respond to the maintenance and repair area of ​​the vehicle warehouse and control center at the end of the line will be held in the region of Pelitli. With the planned TCDD Gar station you will be connected with other cities, especially Istanbul via Marmaray and High Speed ​​Train. The journey will start from the first station, Darica Beach Station, 12. and the last station, OSB station, will be completed in a short time such as 19 minutes.

 

Be the first to comment

Leave a response

Your email address will not be published.


*