3 Katli was first shot in the Great Tunnel of Istanbul

3 Katli Büyük Istanbul Tunnel is the First Digging Shot: Work has started in the Greater Istanbul Tunnel Project with the 3 storey that will pass under the Bosphorus. 1 will be completed in August with two Turkish and Singapore-flawed ships between Kandilli and Akıntı Cape for ground surveys expected to last for 3 year.

The first digging in the Greater Istanbul Tunnel Project was passed by the Ministry of Transport, Maritime Affairs and Communications under the Bosphorus. The tender for the ministry of engineering services was finalized in February. The winning company started the ground survey studies in the region where a tube tunnel will be placed under the Bosphorus and planned to be built of 3 floors. Within the scope of the works, Turkish flagged Alcatras and Singapore flagged Fugro Scout ships are being searched in the area between Kandilli and Akıntı Burnu. The 24 3 is scheduled to end in August. It was learned that the ships will scan the ground along the line where the flow velocity and the tunnels will be placed in the region between Kandilli and Akıntıburnu during the two month period. The preparatory work to be carried out in the field within the scope of the project is expected to take a year.

3 will be storey

There will be both a highway and a rail in the tunnel that will pass under the water in the Bosphorus. In the tunnel, there will be two lane roads in the tunnel, the middle and the lower part of the car, which will be suitable for the transition to the wheel. The second leg will start at the Hasdal junction on the TEM highway on the European side and connect to the Çamlık junction on the Anatolian side through the Bosphorus. There will be two strips of two arrivals going on the road two. The tunnel will be integrated with the TEM Motorway, the E-5 Highway, the Northern Marmara Motorway and the 5 metro line.

Shelter: I www.gazetevatan.co

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.