Procurement Notice: Malatya-Diyarbakır line km: Constructing retaining wall and channel at 434 + 743 tunnel entrance and exit

Distance to Malatya-Diyarbakır line: Constructing retaining wall and channel at 434 + 743 tunnel entrance and exit
GENERAL DIRECTORATE OF THE TURKISH STATE RAILWAYS MANAGEMENT (TCDD) 5. REGIONAL PURCHASING AND STOCK CONTROL DEPARTMENT

MALATYA-DIYARBAKIR LINE KM: 434 743 DEFINED WALL AND CHANNEL OF 68 NOLU TUNNEL INPUT AND OUTPUT construction work will be tendered by open tender procedure according to the article 4734 of Public Procurement Law No. 19. Detailed Information about the auction can be found down below.
Tender Registration Number: 2017 / 211162
1 of Administration
a) Address: Yeşiltepe Gazi Mahallesi Medeniyet Avenue 10 / 2 Yeşilyurt / MALATYA MALATYA MERKEZ / MALATYA
b) Telephone and fax number: 4222124800 - 4222124820
c) E-mail Address: 5bolgeinsaatihale@tcdd.gov.tr
ç) The internet address of the tender document can be seen at: https://ekap.kik.gov.tr/EKAP/

2-Construction work
a) Quality, type and quantity:
400,174 m3 All Types of Construction in Dry or Water at Each Dose of Iron Concrete (with C 25 / 30 Concrete), 674,148 m3 200 Dosing Cement Mortar
Detailed information can be obtained from the administrative specification contained in the tender document in EKAP.
b) Location: DİYARBAKIR
c) Date of commencement: within 5 days from the date of signature of the contract
work place delivery will start.
d) Duration of work: 120 (CENTURY DAY) is the calendar day from the delivery of the place.

3- Tender
a) Location: Yeşiltepe Gazi Mahallesi Medeniyet Caddesi 10 / 2 Yeşilyurt / MALATYA
b) Date and time: 30.05.2017 - 09: 30

ihale_dokumani_xnumx_xnumx

Tender notices published on our website are for information only and do not replace the original document. The original document is valid for the differences between published documents and original tender documents. Our sources are Official Gazette, Daily Newspapers, Public Institutions and Institutions web pages.

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.