Test Carriage of Electric Rail Freight Tests in Tavsanli

Test Carriage of Electric Rail Freight Tests in Tavsanli: In Tavşanlı district of Kütahya, electric freight train transport test drive started.

Tavşanlı and Eskişehir began the testing of freight transport with electric locomotives. Very recently it was learned that it would work between Tunçbilek and Eskişehir. It was stated that with the completion of the line upholstery, it would make a great contribution to the country's economy, and with a high load capacity, less energy would be transported.

In addition, because the power of the electric train has a high load carrying capacity and oil dependence on the external dependence of electricity and lower cost of freight transport is targeted.

The authorities warned that they should not approach this line due to the high voltage on the electricity line along the Tavşanlı-Eskişehir railway line.

Similar Railway News

Similar High Speed ​​Train News

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Comment

  1. What is Balıkesir-Tavşanlı? Still not finished? We expect a KAPIDAĞ blue train to run from Bandırma to Eskişehir. In addition, when Manisa menemen is over, Ankara and Pendikten YHT can be operated from Eskişehir, Kütahya-Balıkesir-Manisa -menemen. I'm telling you this information based on an expert acquaintance on the railways. YHTs can limit the speeds they can put on the electric rail. This can be done with the max 140-160 mileage limitation. In this way, until the end of the normally planned YHT routes between Istanbul-Izmir and Ankara-Izmir, the operation starts in this way. deadlines approach the times of cars. In this way, the construction costs of the YHT paths take off. There is a serious prestige for the Ministry of Transport.

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.