21.5 billion will be spent for rail investments in Istanbul

21.5 billion will be spent for Istanbul's rail system investments: The strategic plan prepared by the Istanbul Metropolitan Municipality for the years 2015-2019 is aimed at radical transformations in Istanbul.

It is planned to spend 5 million TL for urban transformation in 128,6 years, 5,1 billion TL for spreading green areas and 21,5 billion TL for rail systems in Istanbul. 50 bridges will be renewed and strengthened in the next 5 years, and the length of the rail system will increase by 140 percent. All buses, minibuses and taxis will be suitable for disabled people, and minibuses will be boarded with Istanbulkart.
Sea transportation not forgotten

The 2015-2019 Strategic Plan, prepared by the Istanbul Metropolitan Municipality and presented to the municipal council, included information on the costs, completion time and general details of the projects that will evolve from Istanbul. In the 9 section, information on what to do in Istanbul is planned to be spent between 2015 - 2019 and 21,5 billion TL for rail system projects, while 21,5 Trillion TL is planned to be spent. As a result, 683 will increase by 2019 and 140 will increase by 295. 2017 10 up to the 5 new ship and the percentage of people using the sea route is expected to find XNUMX scaffolding will be installed at the points outside the city for urban freight transportation, and freight transport will be done here by sea vehicles.

Aesthetic Istanbul period

According to the Strategic Plan, important steps will be taken for the cleanliness and aesthetics of the city while planning to provide all the Istanbul's zoning plans on the internet. Accordingly, 128,6 million TL will be spent on urban transformation practices, and 6,5 million TL will be spent to protect and improve the Bosphorus prediction area. While it is estimated that 16,7 tons of solid waste will be collected daily in the city, 310 million kilowatt-hours of electricity will be produced from these wastes annually. With this amount, the electricity of a district of Istanbul with a population of approximately 300 thousand will be produced from garbage for a year. Illumination of important historical buildings and square projects of the city will be completed in this period. Among these projects Kadıköy Its coast, Bakırköy Square and Aksaray Square are also located.

Disabled Taxis Coming

2019bin 6 minibus, 363 marine engine, 393 taxi will be adapted for handicapped use when planning the completion of the infrastructure for minibus, taxi and service vehicles to get license via 572. In 2016, 100 of the minibuses will be loaded with Istanbulkart. Plans for the green areas, which are frequently on the agenda in Istanbul, were also included in the strategic plan. Accordingly, 5 annually in the city 5.1 Billion TL, green space will be spent to disseminate. To this end, only the European side of 36,2 million flowers will be planted. Green area and promenade places 1,4 to be increased to million square meters. Sultangazi City Forest, consisting of Ortaköy Valley, Hacıosman Grove and 3 stage, is located in the center of the city and was one of the projects to be completed in this process. Historical walls, castles, fountains and many lost works will be done in this period.

Be the first to comment

Leave a response

Your email address will not be published.


*