The Train That Comes Out Is Not The High Speed Train: TCDD made a statement regarding the news titled "Fire in the high speed train" published in some press organs today. Today, news titled "fire in high speed train" appeared in some media outlets. [more…]
BursaRay stations and bridge renovation work since the last year, almost because of returning to the construction site in the east of Bursa, will begin to breathe easy from January. A metro, a bridge built on the Ankara Road linking the city center to Yıldırım, Kestel and Gürsu. [more…]
Train Journey with Chinese Railways: The People's Republic of China is the country with the world's largest and busiest railway lines. Railways in the country have reached every city. This situation makes railways indispensable for China. China Railways country [more…]
Durmazlar The tram, which continues to be produced within the machine, is produced as a steel frame with 205 cabins, with a capacity of 277 passengers, 5 of which are standing, flexible type with 4 joints, colored glass, flame-protected composite coated air-conditioned. 48 in normal loaded condition [more…]
The first local tram silkworm was put on the rail: with Bursa Metropolitan Municipality Durmazlar Machines produced by Turkey's first indigenous tram rails indie silkworm. Turkey's first indigenous tram passed the test of silkworm European accredited engineering organizations. Metropolitan Municipality [more…]
METRO CONSTRUCTION AND ELECTROMECHANICAL SYSTEMS WILL BE DONE, SUPPLY, ASSEMBLY AND COMMISSIONING WORKS Istanbul Metropolitan Municipality, Rail System Department, Anatolian Side Rail System Directorate Kartal Kaynarca Metro Construction and Electromechanical Systems Supply, Installation and Operation [more…]
Steel Construction Parts will Buy Turkey Railway Machines Industry Inc. (TÜDEMSAŞ) Tender Registration Number: 2012/188593 1 - Administration's a) address: KADI BURHANETTIN MAH. 58059 b) telephone and fax number: 3462251818 / 1708-4699 - 3462235051 [more…]
New developments have been made regarding the procurement of 126 vehicles under the Üsküdar - Ümraniye - Çekmeköy Metro Line, which will be held by the Istanbul Metropolitan Municipality Department of Transportation. According to the information received by the Investments Magazine; The specification preparation works of the tender are at the completion stage. [more…]
The tender for the purchase of 2 meters 25x2012x4000mm high frequency cable to be used in the Ankara - Eskişehir line section, whose bids were collected on September 10, 4 by the 1.2nd Regional Directorate of the TC State Railways (TCDD) Enterprise, was concluded. Information received by the Investments Magazine [more…]
Service Procurement of 76 Level Crossings Operation Officers for Protection and Maintenance of Protected Level Crossings in the District of BALIKESİR Road Maintenance and Repair Department Protection and Maintenance of Protected Level Crossings in UŞAK Road Maintenance and Repair Department [more…]
TENDER NOTICE OF TURKISH WAGON INDUSTRY Inc. The Complete Seat Table Procurement Job WILL BE TENDERED BY OPEN TENDER. File Number: 20130043 Tender Registration Number: 2012/196209 1- Administration's a) Address: MİLLİ EGEMENLİK [more…]
SUBJECT OF THE TENDER 4 Items of Various Tire Locomotive Materials Will Be Purchased WORKPLACE LOCOMOTIVE FACTORY DIRECTORATE FILE NUMBER 85.02 / 122365 TENDER DATE AND TIME 17.01.2013 Time: 14.00 ANNOUNCEMENT DATE 27.12.2012 TENDER PROCEDURE Open Tender SPECIFICATION [more…]
TÜLOMSAŞ GENERAL DIRECTORATE SUBJECT OF TENDER 19 Item Various Pipe Fittings Will Be Purchased WORKPLACE Wagon Factory Directorate TENDER REGISTRATION NO / FILE NO 2012/189805 - 82.02. (2) .1469 / TENDER DATE AND TIME 16 January 2013, 15:00 [more…]
The bids of the Istanbul Metropolitan Municipality's Kartal - Kaynarca Metro Project Construction and Electromechanical Works Supervision Consultancy and Engineering Services Job tender were collected on December 18, 2012. According to the information received by the Investments Magazine; After the evaluation studies to be carried out, [more…]
SUBJECT OF THE TENDER 2 Item Mononlock Body Inner Diameter Processing Work PLACE GEAR AND WHEEL FACTORY FILE NUMBER 85.02 / 122135 TENDER DATE AND TIME 14.01.2013 14:00 ANNOUNCEMENT DATE 26.12.2012 TENDER PROCEDURE Open Tender SPECIFICATION / BANK [more…]
PERSONNEL SERVICE WILL BE TAKEN. TR. GENERAL DIRECTORATE OF STATE RAILWAYS OPERATION (TCDD) 4. REGIONAL MATERIAL DIRECTORATE Purchase of general service jobs with 63 workers. (Cleaning, Loading, Evacuation, Reception, Communication Officer) service procurement is in accordance with Article 4734 of the Public Procurement Law No. 19. [more…]
EXPROPRIATION SERVICE WILL BE TAKEN. TR GENERAL DIRECTORATE OF STATE RAILWAYS OPERATION (TCDD) 4. REGIONAL MATERIAL DIRECTORATE Yerköy Sivas High Speed Train Project will be used to carry out the expropriation process. service procurement [more…]
Bursa High Speed Line | TCDD Gürsuyu laid out two new stations in Yenisehir on Sunday; With the participation of 3 Minister of High Speed Train Bursa station, the details of the project started to be determined. In this direction; Details of State Railways [more…]
The pre-selection evaluation studies of the tender for the Istanbul City-wide Rail System Lines Survey Project Services Consultancy Service, whose applications were collected on October 15, 2012 by the Transportation Department of Istanbul Metropolitan Municipality, Transportation Planning Directorate, were completed. Investments [more…]
Metrobus driver prevented a major disaster. A car driver allegedly going forward in Bahçelievler, crashed into a van going from the left lane. The minibus toppled and plunged into the metrobus stop. Meanwhile, the driver of the metrobus approaching the station, noticing the accident [more…]
In the Esenboğa Airport Rail System Connection Survey Project and Engineering Services Consultancy Service tender, which will be carried out by the General Directorate of Infrastructure Investments (AYGM), evaluation studies have been completed. According to the information received by the Investments Magazine; said tender for 3.380.000 TL [more…]
Will a high-speed train come to Bolu? AK Party deputy Ali Ercoşkun Bolu, Turkey State Railways (TCDD) General Directorate for the 15 provinces found that start in a statement on High Speed Rail Project. Ercoşkun in newly created high-speed train projects [more…]
The Foundation of Afyonkarahisar Ankara High Speed Train Line is Being Launched With the completion of the Afyonkarahisar Ankara High Speed Train Line Project in three years, the distance between the two cities will decrease to one hour and 15 minutes. Afyonkarahisar Ankara High Speed Train Line Project [more…]
The proposals of the "Kırıkkale - Yerköy Section Infrastructure Construction Supervision and Consultancy Service" tender for the Ankara - Sivas High Speed Train Project, which will be carried out by the General Directorate of Turkish State Railways (TCDD), were collected on 17 December 2012. Investments Magazine received [more…]