No photo
GENERAL

TCDD Catenary Maintenance Bus Technical Specification

0.0.0. Purpose This specification has been prepared to determine the technical characteristics of the building car to be used in the establishment and operation (measurement, maintenance, repair and adjustment) of the railway electrification fixed facilities in accordance with the technological rules and the conditions to be sought in the purchase. 0.0.1. Scope [more…]

06 Ankara

Kızılay - Çayyolu (M2) and Tandoğan - Keçiören (M4) metro projects will be announced in the second half of 2012 for signaling, electrification and ventilation tenders.

Kızılay - Çayyolu (M2) and Tandoğan - Keçiören (M4) subway projects, which will be carried out by the General Directorate of Infrastructure Investments, within the scope of the "Ankara Metro Project", will start the specification preparation works for the signaling, electrification and ventilation tenders. Investments Magazine [more…]

35 Izmir

Infrastructure Investments GM İzmir - Kemalpaşa Logistics Center Project Infrastructure works are expected to be announced this week.

New developments have been made regarding the "İzmir - Kemalpaşa Logistics Center Project" to be carried out by the General Directorate of Infrastructure Investments. According to the information received by the Investments Magazine; The specification preparation works will be announced this week for the infrastructure works that are about to be completed. [more…]

WORLD

Savronik A.Ş. and Dimetronic SA companies appealed to the Authority for the result of the tender of the Hasanbey Logistics Center Signalization and Telecommunication Project

New developments were recorded regarding the “Construction of Signalization and Telecommunication Systems for Hasanbey Logistics Center” tender, whose bids were collected on 20 June 2011 by the General Directorate of Turkish State Railways (TCDD). According to the information received by the Investments Magazine; Savronik [more…]

34 Istanbul

Rails Between Izmit and Gebze Are Dismantled

After the train services between Izmit and Gebze were stopped due to the High Speed ​​Train (YHT) Project, the old rails were dismantled for the rail system suitable for high-speed trains. While the dismantling work is carried out between Gebze and Körfez districts at the first stage, the railway's Derince-Köseköy [more…]

01 Adana

Adana Public transport towards the new period

Adana Metropolitan Municipality Deputy Mayor Zihni Aldırmaz made important statements about the future of public transportation in Adana during the visit of the new management of the Chamber of Mechanical Engineers Adana Branch. Branch President Hüseyin AtıICI, during the visit, [more…]

16 Bursa

Meaningful Revision to Bursaray's Kestel Line

While the Metropolitan Municipality continues to work on the Bursaray Kestel line, it has revised the project in order not to cut the two historical plane trees next to the Hacivat Bridge. Metropolitan, 500 years old, both natural monuments and previously prohibited by court order [more…]

WORLD

Samsun Sarp Railway Project

Common target of Samsun, Ordu, Giresun, Trabzon, Rize and Hopa TSO presidents. The presidents of Samsun, Ordu, Giresun, Trabzon, Rize and Hopa TSO operating in the Black Sea Region, joint action to start a railway project on the route from Samsun to Sarp [more…]

Related Articles and Advertisements