KAYSERİ NORTHERN GOVERNMENT VARIATION (INFRASTRUCTURE, SUPERSTRUCTURE, SIGNALIZATION-TELECOMMUNICATION AND ELECTRIFICATION) IKMAL CONSTRUCTION WORKS REPUBLIC OF TURKEY GENERAL DIRECTORATE OF STATE RAILWAYS (TCDD) RAISING DEPARTMENT Kayseri North Transition Variant (Infrastructure, Superstructure, Signalization-Telecommunications and Electrification) Supply Construction [more…]
Merinos-Mudanya Historical Railway: As I read the latest development about Ankara-Bursa High Speed Train Construction in Ray Haber, I dived into the past as follows; Our historical Bursa trip we organized as the Railway Friendship Group (DDG) in January 2007 is a film strip before my eyes. [more…]
New developments have been made regarding the "Kayaş - Yerköy Line" within the scope of the "Ankara - Sivas High Speed Train Project", which will be carried out by the General Directorate of Turkish State Railways (TCDD). According to the information received by the Investments Magazine; with the tender in question [more…]
The deadline for submitting bids for the "Geyve - Sapanca Inter-Geyve - Sapanca Design and Construction Works" tender within the scope of the "Istanbul - Ankara High Speed Train Project", which will be realized by the General Directorate of State Railways with a European Investment Bank loan, has been postponed. Investments Magazine received [more…]
Installation of Signalization and Telecommunication Systems for the Tekirdağ - Muratlı Line Section, which will be realized by the General Directorate of Turkish State Railways (TCDD) Enterprise, and Çerkezköy The proposals for the tender for the. Renovation of the Control Center X tender were collected on the 02 February 2012 day. Investments [more…]
New developments have been made regarding the "Kayseri - Niğde - Ulukışla - Mersin - Adana - Toprakkale Section GSM-R and Transmission Systems Construction Work" of the General Directorate of Turkish State Railways (TCDD). According to the information received by the Investments Magazine; [more…]
The bids of the “Bilecik - Bozüyük Logistics Center Project Infrastructure and Superstructure Construction Works” tender to be held by the General Directorate of Turkish State Railways (TCDD) were collected on January 31, 2012. According to the information received by the Investments Magazine; approximate cost is 45.000.000 TL [more…]
The proposals of the “Construction of Electrification Facilities for Kayseri - Boğazköprü - Ulukışla - Yenice, Mersin - Yenice - Adana - Toprakkale Line Section” of the General Directorate of Turkish State Railways (TCDD) were collected on 01 February 2012. [more…]
New developments have been made regarding the “Kayaş - Çetinkaya Electrification Project” of the General Directorate of Turkish State Railways (TCDD). According to the information received by the Investments Magazine; Technical specifications prepared by the Facilities Department were sent to the Materials Department. Authorities, the completion of the work [more…]
New developments were recorded regarding the “Construction of Signalization and Telecommunication Systems for Hasanbey Logistics Center” tender, whose bids were collected on 20 June 2011 by the General Directorate of Turkish State Railways (TCDD). According to the information received by the Investments Magazine; promise [more…]
Karadeniz Technical University (Ktü) Faculty of Engineering and Architecture Civil Engineering Department of Transportation Dr. Fazıl Çelik, Erzincan-Gümüşhane-Trabzon and Erzincan-Gümüşhane-Tirebolu railway line projects, which were commissioned by a private company by the Ministry of Transport, Maritime Affairs and Communications [more…]
TUNNEL LIGHTING WORK WILL BE DONE TCDD 4. REGIONAL REAL ESTATE AND CONSTRUCTION DIRECTORATE LIGHTING OF DELİKTAŞ TUNNEL ON TECER-KANGAL VARIANT will be tendered in accordance with Article 4734 of the Public Procurement Law No. 19. To tender [more…]
A new arrangement was made in the number of times and trips of High Speed Trains operated between Ankara-Konya-Ankara. In the written statement made by TCDD, according to the new regulation made due to heavy winter conditions and will be valid from tomorrow (9 February 2012), the number of voyages [more…]
Karadeniz Technical University (Ktü) Faculty of Engineering and Architecture, Head of Civil Engineering Transportation Department. Dr. Fazıl Çelik, Erzincan- Gümüşhane- Trabzon and Erzincan- Gümüşhane- Tirebolu, which was built by a private company by the Ministry of Transport, Maritime Affairs and Communications. [more…]
PAINTER ASLIHAN KOÇ'S "MY COLORS" EXHIBITION OPENED AT TCDD ART GALLERY… Painter Aslıhan KOÇ's first solo painting exhibition "My Colors" was opened at TCDD Art Gallery on 30 January 2012. As a result of the painter's work for 4 years, oil paint [more…]
Within the scope of the Erciyes Winter Sports and Tourism Center Project, a qualification tender was held by the Metropolitan Municipality for the construction of a summer sled to the Kabaktepe site. Grand Yapı Teleski-Mehmet was awarded the qualification tender, which is the first part of the three-stage tender held in the Council Hall. [more…]
Karadeniz Technical University (Ktü) Faculty of Engineering and Architecture, Head of Civil Engineering Transportation Department. Dr. Fazıl Çelik, Erzincan- Gümüşhane- Trabzon and Erzincan- Gümüşhane- Tirebolu, which was built by a private company by the Ministry of Transport, Maritime Affairs and Communications. [more…]
BES Elektrik Taahüt Ticaret Limited Şirketi In 2005, BES Elektrik Elektronik MÜH. SUN. TAAH. SINGING. TİC. LTD. ŞTİ started its activities in ADANA New Industrial Zone Ata Kaportacılar Sitesi 3. Blok No: 20 / F. Since 2005 [more…]
The project "Alanya Castle Cableway and Escalator System", which is expected to cost about TL 8 million, was unanimously passed by the municipal council. February Meeting of the Municipal Assembly of Alanya, [more…]
YENİKAPI-HAVAALANI M1 METRO AKSARAY STATION “A” ENTRANCE STRUCTURE CONSTRUCTION WORK WILL BE DONE İSTANBUL ULAŞIM SAN. VE TİC.A.Ş. YENİKAPI-AIRPORT M1 METRO AKSARAY STATION "A" ENTRANCE STRUCTURE CONSTRUCTION WORK according to Article 4734 of Public Procurement Law No. 19. [more…]
Journalists answered the questions of Belkıs Kılıçkaya, Ceyda Karan, Nihal Bengisu Karaca and Selçuk Tepeli in the program of the Minister of Transport, Maritime Affairs and Communication, Binali Yıldırım Press Club. Minister Yıldırım, who gave a "guarantee" for the historical Haydarpaşa Train Station, whose fate is wondered by the public, [more…]
Israel's signing of an alternative project to the Suez Canal by constructing a railway line between the Mediterranean and the Red Sea had an echo in Egypt. The linking of the port of Ashdod on the Mediterranean coast with the railway in the city of Eliyat on the Red Sea, announced by Israel at the end of January [more…]
The deadline for submitting bids for the tender, which will be held with EIB loan, was set at 08:2012 on 14 February 00. The companies that received the specifications for the tender are as follows: 1. Alsim Alarko, 2. Cengiz İnşaat, 3. Doğuş İnşaat, 4. Gülermak İnşaat, [more…]
Bursa Metropolitan Municipality starts the demolition of its bridges on Ankara Road from Hacivat tomorrow. Construction is planned to start within 1 month after the demolition is completed. Renovation works of Hacivat, Balıklı and Deliçay bridges on Ankara Road within the scope of Bursaray's Kestel line [more…]
Bursa High-speed train project to end the full year-long 58 yearly aspiration of Bursa construction of the high-speed train line has finally reached the construction phase. Tender contract 30 Bursa-Yenişehir high-speed train line with 75 kilometers signed in Ankara on December [more…]