The project will be included in the 2012 investment program. Projects prepared by Altmok Engineering-Yuksel Project joint venture will be delivered to DLH General Directorate
Related Articles
DLH Transportation and Feasibility Study Technical Specification
Purpose of DLH Transportation and Feasibility Study Technical Specification: The purpose of the Technical Specification is to ensure that the urban rail system and cable passenger transport system projects are carried out by the Ministry of Transport, Railways, Ports and [more…]
2012 AND 2013 YEARS
Our esteemed Minister Binali Yıldırım declared 20 and 2012 as the Year of Gümüşhane in the meeting we held 2013 days ago and stated as a directive to the bureaucratic staff under him. [more…]
Turkey's Eskisehir high speed train will pass by the longest railway tunnel is being done between-Istanbul.
One of the tunnels to be located in the 533-kilometer 'İnönü-Vezirhan-Köseköy' section, which is the second stage of the 158-kilometer Ankara-Istanbul high-speed train project, is 7 thousand 470 meters long and the other is 6 meters long. [more…]
Be the first to comment